1. Help Center
  2. Onboarding and deployment

How can I prepare for a coaster deployment?

What is Revl responsible for and what is customer provided?

Items we need from [Customer]:

  • Wired internet connection
  • Assistance with camera and wireless transfer module installation.
  • Assistance with track access for beacon installation.
  • locations for the equipment list below. 
  • Physical network connections joining the kiosk area, cart shack, and server/network stack locations. 

Equipment Revl is responsible for installing:

Network stack and server installed under kiosk counter. 

IMG_7216

Kiosk Examples

IMG_7218

Wireless Transfer Access Point and Beacon
IMG_6472

WTMs and Cameras

DSC03655

DSC03682

DSC03635

Batteries

We need a dedicated 20 amp circuit for battery chargers

We use standard Makita power tool batteries and chargers. We typically use 18V 6ah batteries but ended up going with 18V 5ah batteries due to supply chain limitations.

Battery Shelf

36.2"*12.2"*32.3" dimensions after installing.

Apicizon 4-Tier Metal Shoe Rack for Closet, Shoe Shelf for 20 Pairs , Shoes Rack Organizer, Flat or Angled Stackable Shoe Storage for Entryway

Heavy Duty Metal Mesh Shoe Shelves Stand Cool Grey https://a.co/d/0QDHTiK

It will need to be mounted to a wall or sturdy object.

 

IMG_7070-1